• Energy management English

Payback Time: 0 - 3 years

Energy Saving Potential: - percent

  • "An energy-intensive company in the industry/tertiary sector does not always have the proper technical skills to treat energy issues. Therefore, it may need an external support in order to: • Carry out an energy balance sheet and energy audit its energy uses • Identify, qualify and quantify potential energy-saving areas with the most energy-saving potential • Study the feasibility of a solution for energy saving or renewable energy, calculate and dimension this solution "

  • Download document
  • Energy management English

Payback Time: 0 - 3 years

Energy Saving Potential: 5 - 15 percent

  • "• Understand and read your bill • Renegotiate and anticipate your contract: - Analyze the possible rates on certain taxes; the power levels to be subscribed and the electricity transmission options, tariffs (flat rate or not, with or without subscription, fixed or indexed), green electric, capacity, etc. - Request an estimate of the budget (excluding VAT) for the last 12 months and which mentions 3 of the following elements (suppliers, deliveries and taxes). - Consult a broker to get the best rates - Ask suppliers what additional services they can offer: an online platform to monitor their consumption or load curves, etc. - Anticipate the renegotiation of their contracts. - The cancellation period is often equivalent to 45 days / possibility to negotiate 6 ÷ 12 months in advance • Electricity: Discussion 6 months before the due date • Gas: as soon as possible and preferably between April and October. • Adhere to a renewable offer (green energy: energy from renewable sources). It is thus possible to benefit from a guarantee of origin: an electronic document that certifies that for each MWh of electricity consumed an equivalent quantity of renewable electricity is fed into the grid."

  • Download document
  • Energy management English

Payback Time: - years

Energy Saving Potential: - percent

  • "The objective of the regulatory requirements applicable to companies is to allow them to better understand their energy consumption, but also to identify the actions that can improve energy performance. optimisation recommendations • Atmospheric emissions Each company, in order to be operational, is required to obtain a prior authorization for emissions. The current regulatory framework requires that every plant that produces emissions into the atmosphere is previously authorized by the bodies in charge and complies with the limit values ??set. • Energy audit In Italy, Legislative Decree no.102 / 2014 (updated in Legislative Decree no.73 / 2020) and the Action Plan for Energy Efficiency are issued. They stabilize a framework of measures for improving energy efficiency in order to achieve the stabilized objectives for 2021. In particular, within the Legislative Decree 73/2020 it is specified that for the industrial sector, the promotion of perform an energy diagnosis to identify the most effective interventions to reduce energy consumption in small and medium-sized enterprises (in fact the decree states: ""With regard to small and medium-sized enterprises in order to promote the improvement of the level of energy efficiency within on 31 December 2021 and, subsequently, every two years until 2030, the Ministry of Economic Development issues public tenders for the financing of the implementation of energy management systems compliant with the ISO 50001 standard""). Companies that have implemented a Management System compliant with EMAS, ISO 50001 or ISO 14001 that include an energy audit compliant with the decree are exempt from the obligation. Furthermore, Legislative Decree 73/2020 provides for the obligation to install individual meters for end customers, which detect the real consumption and the actual time of use of energy. • Directive 2009/28/EC “Promotion of the use of energy from renewable sources” implemented in Italy through Legislative Decree no. 28/201 the use of the latter for the purpose of those minimum levels of use of renewable energy set by the European community for 2020. The directive fully enters into the energy efficiency of buildings as it imposes, with gradually increasing percentages, the '' use of renewable energies in new buildings or buildings undergoing major renovation. Finally, periodic maintenance is mandatory for some types of equipment, including heaters, air conditioning and refrigeration, compressors, etc. Always adhere to the manufacturer's specific maintenance and service specifications."

  • Download document
  • Energy management English

Payback Time: - years

Energy Saving Potential: - percent

  • When investing in energy-using equipment, it is essential to evaluate a full life-cycle cost approach: investment costs, energy use and maintenance costs during its life cycle and recycling/waste. It shows that for most energy-using equipment, costs in the use phase have the largest share of the total costs over the technical lifetime. Due to savings generated in the use phase through optimisation measures, extra costs at purchase can be amortised very quickly.

  • Download document
  • Fans - hvac Fans - hvac English

Payback Time: 0 - 3 years

Energy Saving Potential: 15 - 30 percent

  • "Many plants run all year long (24/7) while production or usage times may be different. When optimizing the HVAC, the first question should be which areas should be supplied and at what times. The resulting energy savings are among the simplest and most effective measures. The reduction of the running time not only saves power for the fan, but also energy for air conditioning (heating, cooling, humidifying and dehumidifying).Further advantages which result from the reduction of the running time are: • Reduced maintenance intervals: As many systems need to be serviced after certain hours of operation (for example, periodic inspection, etc.), the maintenance interval can be extended. • Reduced filter replacement: Filters are usually changed after a certain pressure difference or after a certain running time. Reducing the runtime reduces both the level of contamination and the filter's operating time."

  • Download document
Showing 21 - 25 of 57