• Steam English

Payback Time: 0 - 30 years

Energy Saving Potential: 10 - 30 percent

  • "Recover as much condensate as possible: Recover condensate at the highest possible thermal energy: Flash high pressure condensate to make low pressure steam: Vented vs. Pressurized Condensate Recovery: "

  • Download document
  • Steam English

Payback Time: 0 - 3 years

Energy Saving Potential: 3 - 10 percent

  • Pre-heating input streams such as feed water, combustion oxygen or others with other heat sources, especially by using the exhaust gas heat potential in order to increase the overall energy efficiency. This can be done by using an economiser, a condensing economiser and an air pre-heater or, most efficiently by a combination of them. 

  • Download document
Showing 56 - 57 of 57